Tunnel Formwork: A Brief Overview

30 Dec.,2024

 

Tunnel Formwork: A Brief Overview

Tunnel formwork is a specialized type of construction equipment designed to facilitate the building of high-rise commercial structures. The system was invented over 50 years ago, but it&#;s more popular today than ever. Contractors can read on to find out what they need to know about tunnel formwork.

Please visit our website for more information on this topic.

The Benefits of Tunnel Formwork

Modern tunnel formwork allows walls and slabs to be cast in one single operation. These systems often rely on Table Formwork Construction, which creates a complete bay out of a suspended floor slab for quick installation and maximum mobility. The formwork provides reinforcement, then the concrete workers can perform a single, continuous pour to create the slabs and walls.

Using tunnel formwork can speed up the construction process significantly. Just ten workers can complete a 10-story building using this system in as little as 20-30 days. If the workers have dedicated training in tunnel formwork construction best practices, the resulting concrete finish will also be of high quality, reducing the need for plasters. You need to ensure you are using highly durable materials, like structural steel.

Tunnel formwork isn&#;t just efficient. It&#;s also highly earthquake resistant and excellent at reducing sound transmission, so it can create a safer work environment for the construction team. Since these systems are relatively easy to use, the chances of workplace accidents occurring under the watch of trained site managers and contractors are quite low.

High-quality tunnel formwork is factory-manufactured to exacting standards using durable, incredibly strong materials like structural steel. Though purchasing tunnel formwork requires a not insignificant initial investment, it can save contractors money over time since each form can be reused up to 600 times in height and size adjustable ways.

The Casting Process

One of the many great things about tunnel formwork is that the forms themselves are factory-constructed off-site. Once the forms are at the building site, the casting process is relatively simple and can be performed on a 24-hour construction cycle. There are seven stages to tunnel formwork casting:

1. Position the prefabricated wall reinforcements along the wing of the structure using a crane.

Crane two-and-a-half tunnels into position and bolt or securely fasten them together.

Pour the concrete for the walls.

Fix the slab reinforcements.

Place the concrete slab and use tarp wraps and butane heaters to sustain high temperatures for overnight curing.

Remove the tunnel forms the following day.

Repeat the process for the next set of bays.

Contractors who have never worked with tunnel formwork will need some specialized training before starting the job. However, the system itself is quite simple and trained workers should be able to complete projects with remarkable speed and accuracy.

Choose Tunnel Formwork to Save Time and Money

Since tunnel formwork allows contractors to produce durable cellular structures, it can improve the efficiency of any high-rise construction process. Contractors that have the equipment and expertise to use tunnel formwork can usually achieve time savings of up to 25% and reduce costs by around 15%, increasing the company&#;s revenue and letting construction managers pass some of those savings on to clients.

You will get efficient and thoughtful service from Kaichaungxing.

The Bottom Line

The use of tunnel formworks in high-rise construction is nothing new, but not all contractors are familiar with these remarkably efficient systems. Before purchasing forms, investigate the supplier to make sure the company utilizes only high-quality materials and produces reliable, easy-to-use formwork, and be prepared to provide on-site training for the company&#;s entire construction crew.

Tunnel Form Construction Technique

Fast track construction techniques are being increasingly adopted in projects for inherent advantages like reduction in time and cost and even better quality of construction. Pre-cast / Prefabricated / Pre-engineered buildings, modular construction etc are some examples of fast track construction techniques.

What about formwork? Can it also facilitate faster construction?

The answer is Yes !!  And the method is Tunnel Formwork.

Tunnel Form Construction Technique was invented over 50 years ago and is used to cast high quality monolithic structures. It is basically an operation to cast walls and slabs in one operation and produces systematic, sound proof and earthquake resistant structures.

It is widely used in the construction of cellular structures with high degree of repetition such as Hotels, Hostels, Residential and Commercial buildings.

Tunnel formwork come in half units and in the form of an inverted &#;L&#; which are bolted together at the top to form each tunnel. The inbuilt wheels and the jacks help the formwork move in and out of the position and adjusted to the final height. The factory-made steel formwork can be re-used up to 600 times and it can suit a variety of module sizes.

 Stages of Construction

  • Stage One: Prefabricated Wall reinforcement is placed by crane along the entire wing.
  • Stage Two: Two and a half tunnel is craned into place, bolted together and ties are added.
  • Stage Three: The wall concrete is poured.
  • Stage Four: The slab reinforcements are fixed
  • Stage 5: The slab concrete is placed.
  • Stage 6: The tunnel-forms are removed next day.
  • Stage 7: The process is repeated for the next two bays.

 

Advantages

This makes the method of construction very versatile and extremely economical. It can produce strong and durable in-situ cellular structures and can achieve time savings up to 25% with cost savings of around 15%.

It allows a 24-hour construction cycle to be achieved and thus the buildability of in-situ concrete is improved by choosing this type of formwork.

Since the concrete finish is very good, the requirement for post construction trades such as plasterers and electricians are greatly reduced.

www.neru.com.tr   www.theconstructir.org

Watch the video clip at :    https://www.youtube.com/watch?v=5vD62cZN4LE

If you want to learn more, please visit our website steel formwork trolley for tunnel and highway construction.