China Hydraulic Tunnel Linning Trolley factory and suppliers

13 Jan.,2025

 

China Hydraulic Tunnel Linning Trolley factory and suppliers

Designed and developed by our own company, hydraulic tunnel lining trolley is an ideal system for formwork lining of railway and highway tunnels. Driven by electrical motors, it is able to move and walk by itself, with hydraulic cylinder and screw jack being used to position and retrieve the formwork. The trolley has many advantages in operation, such as low cost, reliable structure, convenient operation, fast lining speed and good tunnel surface.

You can find more information on our web, so please take a look.

The trolley is generally designed as a steel arch type, using a standard combined steel template, without automatic walking, using external power to drag, and the detachment template is all manually operated, which is labor-intensive. This type of lining trolley is generally used for short tunnel construction, especially for tunnel concrete lining construction with complex plane and space geometry, frequent process conversion, and strict process requirements. Its advantages are more obvious. The second tunnel reinforced concrete lining adopts a simple arch frame design, which solves these problems well, and at the same time, the engineering cost is low. Most of the simple trolleys use artificial concrete pouring, and the simple lining trolley is filled with concrete conveying pump trucks, so the rigidity of the trolley should be particularly strengthened. Some simple lining trolleys also use integral Steel Formwork, but they still use threaded rods and do not move automatically. This type of trolley is generally filled with concrete delivery pump trucks. Simple lining trolleys generally use combined steel formwork. Combined steel formwork is generally made of thin plates.

The rigidity of the steel formwork should be considered in the design process, so the spacing between steel arches should not be too large. If the length of the steel formwork is 1.5m, the average spacing between the steel arches should not be greater than 0.75m, and the longitudinal joint of the steel formwork should be set between the push and the push to facilitate the installation of formwork fasteners and formwork hooks. If the pump is used for infusion, the infusion speed should not be too fast, otherwise it will cause deformation of the composite steel formwork, especially when the lining thickness is greater than 500mm, the infusion speed should be slowed down. Be careful when capping and pouring. Pay attention to the pouring of concrete at all times to prevent the concrete pouring after filling, otherwise it will cause mold explosion or deformation of the trolley.

Tunnel trolley-Products-Zhongjun construction steel mould ...

required

These cookies are necessary for basic functions such as payment. Standard cookies cannot be turned off and do not store any of your information.

With competitive price and timely delivery, Kaichaungxing sincerely hope to be your supplier and partner.

analyze

These cookies collect information, such as how many people are using our site or which pages are popular, to help us improve the customer experience. Turning these cookies off will mean we can't collect information to improve your experience.

Feature

These cookies enable the website to provide enhanced functionality and personalization. They may be set by us or by third-party providers whose services we have added to our pages. If you do not allow these cookies, some or all of these services may not function properly.

advertise

These cookies help us understand what you are interested in so that we can show you relevant advertising on other websites. Turning these cookies off will mean we are unable to show you any personalized advertising.

Contact us to discuss your requirements of Steel Tunnel Trolley for Construction. Our experienced sales team can help you identify the options that best suit your needs.